Electrical was progressing very nicely today until I ran out of wire. Those 3-way switches (on and off from two different locations) take a lot of wire! We have that type of switch system for the entry light and also for the main ceiling lights. Now I'm in need of wire to finish the lighting as well as the final two 110V receptacles. I couldn't get my brain engaged in running PEX for the water lines yet so I decided to spend sometime on the floor boards instead. While I'm not ready to install the boards yet (because the electrical and plumbing have to finished first) I can still cut the boards and put them in place, just not screw them down at all. We feel really good about the headroom in the front part (over 74" after the ceiling is installed.) It's also got a nice little storage area for the ladder and Fiamma awning crank rod.
0 Comments
Leave a Reply. |
Details
AuthorCalvin here - after spending almost 33 years in education as a high school teacher, elementary teacher, and elementary administrator, it was time to retire! I did so happily and with no regrets; it was a terrific and fulfilling career. I do enjoy building projects as the design and building process is very therapeutic and you see a completed functional product in the end. Now to combine the build with another of Angela's and my passions - travel - is something we're really looking forward to. Archives
September 2022
Categories |