The cabinet was all prepped a few days ago and waiting for some extra hands to install the fridge. Today cousin Tony stopped by for a visit and I got him to help lift the fridge into Redford and into place. We lifted it in the sliding door, connected the 12V wires and passed the 110V cord through the shelf and the fridge went into place. Overall the fit is great and I got some stainless steel screws to secure it into cabinet.
Other work that has been accomplished includes completing the wood linings for inside the passenger side dining bench (sleeping area) and planning out how I'm going to construct the walls and window frames. In the appliance cabinet the microwave/convection oven got secured and the Lagun table mount was attached to the panel.
0 Comments
Leave a Reply. |
Details
AuthorCalvin here - after spending almost 33 years in education as a high school teacher, elementary teacher, and elementary administrator, it was time to retire! I did so happily and with no regrets; it was a terrific and fulfilling career. I do enjoy building projects as the design and building process is very therapeutic and you see a completed functional product in the end. Now to combine the build with another of Angela's and my passions - travel - is something we're really looking forward to. Archives
September 2022
Categories |